Project Description
Perth Fibreglass Pools won the tender to rejuvenate the dilapidated, tiled hydrotherapy pool at the SportsMed facility within the St John of God Hospital. The Perth Fibreglass Pools team worked closely with the St John of God engineering department and outside engineering consultants (GHD).
The old pool was leaking and the grout had failed. The pool looked tired and uninviting to clients and visitors. A new FRP lining was applied, which was 4 x the strength of a normal pool at 1200 GSM and finished with AQUAGUARD resurfacing gelcoats.
This 5-week project adhered to the codes of practise for Aquatic Facilities 2007 and the local Department of Health and local Shire regulations were met.
The SportsMed facility management and shareholders were delighted with their new facility that was completed on time and on budget.